Geotube Adaro Projects
Slurry Management
In an open-pit or open-cut mine with a large catchment area, thousands of cubic metres of rainfall runoff slurry may flow into the pit everyday. The slurry should be removed from the pit to allow the continuation of mineral extraction by pumping it out into settling ponds. When the settling ponds are full with sediments and where there are no options in mine extraction planning, cost budgeting and space availability, the mining corporation faces a threat of ceasing its operations.
TenCate Geotube dewatering technology is the answer to the problems that occur in slurry management. Slurry in the pit and settling ponds can be managed according to the needs of the mining operations with effective long term planning that will bring cost benefits to the mining corporation without compromising environmental and safety aspects.